DRAFT ENVIRONMENTAL IMPACT REPORT

For The

2055 AVENUE OF THE STARS ON THE SITE OF THE FORMER ST. REGIS HOTEL

 

 

LEAD AGENCY: CITY OF LOS ANGELES

CASE No: ENV-2005-4496-EIR

SCH No: 2005081042
SITE LOCATION: 2055 Avenue of the Stars

Draft Environmental Impact Report Table of Contents of Graphics Exhibits

All graphics files are provided as Adobe Acrobat Portable Document Format (PDF) files. 

Click here to view the Table of Contents for the Text Sections and Appendices

Figures:

II-1               Regional and Vicinity Map (67k)

II-2               Aerial Photograph (228k)

II-3               Photograph Location Map (36k)

II-4               Existing Views of the Project Site (297k)

II-5               Views of Surrounding Uses (166k)

II-6               Views of Surrounding Uses (320k)

II-7               Views of Surrounding Uses (188k)

II-8               Views of Surrounding Uses (290k)

II-9               Related Projects Map (1.8M)

III-1             Regional and Vicinity Map (54k)

III-2             Proposed Plot Plan (535k)

III-3             Proposed Elevation (152k)

III-4             Landscape Plan (659k)

IV.B-1          Winter Solstice Shading (568k)

IV.B-2          Summer Solstice Shading (488k)

IV.B-3          Equinox Shading (607k)

IV.B-4          Summer Shadow Cumulative Impact (630k)

IV.B-5          Views from the Project Site (146k)

IV.B-6          Views of the Project Site (131k)

IV.B-7          Skyline Views (234k)

IV.B-8          Views of the Project Site (117k)

IV.D-1          Tree Survey (553k)

IV.E-1          Sanborn Map (181k)

IV.I-1           West Los Angeles Community Plan Land Use Designations (107k)

IV.I-2           West Los Angeles Transportation Improvement and Mitigation Specific Plan (140k)

IV.I-3           Century City North Specific Plan (45k)

IV.I-4           Century City North Specific Plan Commercially Zoned Areas (92k)

IV.I-5           Existing Zoning Designations (126k)

IV.K-1         Noise Measurement Locations (32k)

IV.M-1         Fire and Police Station Locations (4M)

IV.M-2         School and Library Locations (1.4M)

IV.M-3         Park and Recreation Center Locations (1.4M)

IV.N-1          Study Intersection Lane Configurations (561k)

IV.N-2          AM Existing (520k)

IV.N-3          PM Existing (657k)

IV.N-4a       Haul Route Map, Option 1 (486k)

IV.N-4b       Haul Route Map, Option 2 (483)

IV.N-4c       Haul Route Map, Option 3 (455k)

V.N-5           Project Trip Distribution (432k)

IV.N-6          Project Assignment Percentages (440k)

IV.N-7          Project Trips (Option A) AM/PM Peak Hour (524k)

IV.N-8          Project Trips (Option B) AM/PM Peak Hour (509k)

IV.N-9          Future (2009) Traffic Volumes Without Project AM Peak Hour (503k)

IV.N-10       Future (2009) Traffic Volumes Without Project PM Peak Hour (504k)

IV.N-11       Future (2009) Traffic Volumes With Project (Option A) AM Peak Hour (502k)

IV.N-12       Future (2009) Traffic Volumes With Project (Option B) AM Peak Hour (501k)

IV.N-13       Future (2009) Traffic Volumes With Project (Option A) PM Peak Hour (509k)

IV.N-14       Future (2009) Traffic Volumes With Project (Option B) PM Peak Hour (509k)