FASHION SQUARE EXPANSION PROJECT

Draft Environmental Impact Report (DEIR)

 

EIR No:  ENV 2007-9914-EIR

SCH No:  2007071103

 

September 2008

 

 

PROJECT DESCRIPTION

The Fashion Square Expansion Project is proposed by the Applicant, Sherman Oaks Fashion Associates (an affiliated company of Westfield).  The Applicant seeks approval of to expand the existing Fashion Square shopping center on an approximate 28.8-acre site.  Implementation of the shopping center expansion project requires a Zone Change to bring the entire site to (T)(Q)C2-1L, a Conditional Use Permit for construction of a “Major Development Project” (MDP) that exceeds the threshold of 100,000 square feet of non-residential development, a Conditional Use Permit for Commercial Corner development, a Zone Variance to deviate from the 45-foot height restriction of the Commercial Corner regulations, a Conditional Use Permit for the on-site sale and consumption of a full line of alcoholic beverages (CUB), and a request for Shared Parking.

 

The project involves construction of 280,000 gross leasable square feet (GLSF) of new retail/restaurant commercial space and additional structured parking, resulting in a cumulative total buildout of 1,147,000 GLSF of commercial space and a total of 5,148 parking spaces (combined surface and structured parking).  Total new uses are anticipated to include 240,000 GLSF (i.e., 355,227 gross SF) of new “in-line” retail space and 40,000 GLSF (i.e., 71,329 gross SF) of new restaurant space, in addition to approximately 1,235 new parking spaces.

 

 

SITE LOCATION

14006 Riverside Drive, Sherman Oaks, California 91423

 

 

AVAILABILITY

Hardcopies of the Draft Environmental Impact Report (DEIR) are available for review at the following locations:

     

Department of City Planning

200 North Spring Street, Room 750

Los Angeles, CA 90012

 

Los Angeles Department of City Planning

6262 Van Nuys Boulevard, Suite 351

Van Nuys, CA 91401

 

Central Library

630 West Fifth Street

Los Angeles, CA 90071

 

Sherman Oaks Branch Library

14245 Moorpark Street

Sherman Oaks, CA 91423

 

Encino-Tarzana Branch Library

18231 Ventura Boulevard

Tarzana, CA 91356

 

 

COMMENTS

If you wish to submit comments following review of the Draft EIR please submit them in writing by October 27, 2008.

 

Send comments to:

 

Tom Glick, City Planner

Los Angeles Department of City Planning

6262 Van Nuys Boulevard, Suite 351

Van Nuys, California 91401

(818) 375-5070 (Fax)

Tom.Glick@lacity.org (eMail)

 

The Draft EIR may be purchased on CD-ROM for $7.50 per copy.  To purchase a copy, contact Tom Glick at (818) 374-5062.

 

 

CIRCULATION PERIOD

September 11, 2008 to October 27, 2008

 

 

 

DOCUMENT INFORMATION

 

To view the entire electronic version of the Executive Summary in PDF format, please click here.  [2.32 MB]

To view the entire electronic version of the Draft EIR in PDF format, please click here.  [17.2 MB]

 

To view the entire electronic version of the Appendices (Volume 1) used in the document in PDF format, please click here.  [25.1 MB]

To view the entire electronic version of the Appendices (Volume 2) used in the document in PDF format, please click here.  [37.2 MB]

 

To view specific portions of the electronic version of the document in PDF format, please click on the individual sections listed below.

 

 

 

EXECUTIVE SUMMARY

 

COVER PAGE  [11 KB]

 

TABLE OF CONTENTS  [10 KB]

 

EXECUTIVE SUMMARY  [2.3 MB]

A.     Project Summary

B.     Environmental Review Process

C.     Overview of Planning Context

D.     Areas of Controversy and Issues to Be Resolved

E.     Alternatives to Reduce or Avoid Significant Effects

F.      Summary of Project Impacts

G.     Mitigation Program

 

 

DRAFT EIR

 

COVER PAGE  [16 KB]

 

TABLE OF CONTENTS  [49 KB]

 

I.       SUMMARY  [536 KB]

A.     Summary of Proposed Action

B.     Location and Boundaries

C.     Project Background

D.     Environmental Impact Report Process History

E.     Project Description

F.      Environmental Setting

G.     Major Implications of Project Implementation

H.     Alternatives

 

II.      PROJECT DESCRIPTION  [6.14 MB]

A.     Project Location

B.     Adjacent Land Uses

C.     Project Background

D.     Statement of Project Objectives

E.     Requested Actions and Entitlements

F.      Project Characteristics

G.     Proposed Project Design Features and Standard Conditions

Assumed in Impact Assessment

 

III.     GENERAL DESCRIPTION OF THE ENVIRONMENTAL SETTING  [801 KB]

A.     Overview of the Environmental Setting

B.     Related Projects

 

IV.    ENVIRONMENTAL IMPACT ANALYSIS

A.     Aesthetics and Visual Resources  [948 KB]

B.     Air Quality  [570 KB]

C.     Geology and Soils  [151 KB]

D.     Hazardous Materials and Man-Made Hazards  [101 KB]

E.     Water Resources

1.   Hydrology/Water Quality  [164 KB]

2.   Water Supply  [103 KB]

F.      Land Use, Planning and Urban Decay  [3.07 KB]

G.     Noise  [3.04 KB]

H.     Public Services

1.   Fire  [100 KB]

2.   Police  [102 KB]

I.       Public Utilities

1.   Solid Waste  [97 KB]

J.      Traffic, Circulation and Access  [2.52 MB]

 

V.     ALTERNATIVES  [3.01 MB]

A.     Alternative A: No Project

B.     Alternative B: Existing Entitlement (108,000 GLSF)

C.     Alternative C: Reduced Project 1

(235,000 GLSF - Reduced Height of Parking)

D.     Alternative D: Reduced Project 2

(235,000 GLSF - Maintain Macy’s Parking Structure/Full Closure of Matilija Avenue)

E.     Alternative E: Alternate Site Plan 1

(280,000 GLSF - Proposed Project/No Tunnel/No Subterranean Parking)

F.      Alternative F: Alternate Site Plan 2

(280,000 GLSF Proposed Project/Pedestrian Activation on Riverside Drive)

G.     Alternative G: Promenade (190,000 GLSF)

H.     Alternative H: Environmentally Superior Alternative

 

VI.    OTHER ENVIRONMENTAL CONSIDERATIONS  [179 KB]

A.     Effects Not Found To Be Significant

B.     Significant Unavoidable Impacts

C.     Significant Irreversible Environmental Changes

D.     Growth-Inducing Impacts

E.     Mitigation Monitoring Program

 

VII.   PERSONS AND ORGANIZATIONS CONTACTED  [10 KB]

A.     Lead Agency

B.     Project Applicant

C.     EIR Preparation

D.     Agencies and Organizations

 

VIII.  REFERENCES  [36 KB]

 

 

 

FIGURES

 

Click here for a list of Figures

 

 

 

APPENDICES

 

COVER PAGE  [16 KB]

 

TABLE OF CONTENTS  [15 KB]

 

APPENDIX A  [9.32 MB]

NOTICE OF PREPARATION (NOP), WRITTEN COMMENT LETTERS AND SCOPING MEETING COMMENTS

A-1   NOTICE OF PREPARATION (NOP)

A-2   NOP WRITTEN COMMENT LETTERS

A-3   PUBLIC SCOPING MEETING COMMENTS

 

APPENDIX B  [7.29 MB]

TREE REPORT

 

APPENDIX C  [1.99 MB]

SHADE/SHADOW ANALYSIS

 

APPENDIX D  [3.96 MB]

AIR QUALITY AND NOISE ASSESSMENTS

 

APPENDIX E  [4.60 MB]

GEOTECHNICAL AND SOILS

 

APPENDIX F  [9.95 MB]

PHASE 1 ENVIRONMENTAL SITE ASSESSMENT

 

APPENDIX G  [485 KB]

STORMWATER QUALITY

 

APPENDIX H  [549 KB]

URBAN DECAY REPORT

 

APPENDIX I  [19.4 MB]

TRAFFIC STUDY

 

APPENDIX J  [70 KB]

EMPLOYMENT CALCULATIONS

 

APPENDIX K  [6.07 MB]

SUPPLEMENTAL TRAFFIC INFORMATION FOR PROJECT AND ALTERNATIVES

1.   AVERAGE TRIP LENGTH CALCULATIONS

2.   TRAFFIC COUNT CONFIRMATION

3.   ALTERNATIVES ANALYSIS

 

APPENDIX L  [540 MK]

ZONING (Q) CONDITIONS

 

APPENDIX M  [189 KB]

MITIGATION MONITORING PROGRAM

 

CAM